The utility approval process required before a solar system can connect to the grid and export power. Timelines vary by utility — typically 4–12 weeks for residential. Your solar installer handles interconnection paperwork. Systems cannot legally operate in grid-tie mode until interconnection is approved. Off-grid (battery-only) systems don't require interconnection.